Liquid Fuel Terminal
Liquid Fuel Terminal More pictures Ship Length: Berth "O" up to 150 m Berths "P", "R" up to 300 m Berth "T" up to 350 m Max. draft: Berth "O" 10 m Berths "P", "R", "T" 15.0 m Fully-automated operation Advanced closed...
 
Liquefied Petroleum Gas (LPG) Terminal
LPG Terminal More pictures Ship length up to 190 m Pier length 220 m Max. draft 9.5 m 16 digged in tanks 13,200 t Pumps to support receiving gas from vessels Gas heating and transporting system (400 t/h) to digged in storage tanks 6 pumps (65 t/h) transporting gas from tanks to reloading berth Gas...

Obroncow Poczty Polskiej Quay
Obroncow Poczty Polskiej Quay More pictures Ship length up to 225 m Operating quay length 275 m Max. draft 10.2 m Ship loader 1,200 t/h Cranes 3.2-6.3 t Open stores 20,000 m2 Handling of granulated sulphur up to 10,000 t/24 h The Obroncow Poczty Polskiej Quay is suited to the handling of dry bulk...
 
Cargo statistics

A new LPG Terminal at the Port of Gdansk - 03.07.2008
On 1 July this year, PGA SA and Gdansk LPG Terminal SA signed a land lease agreement with the view to the construction of a gas terminal at the Port of Gdansk.
 
 
     
 